-凯发k8官网下载客户端中心

pubdate:2019-12-25author:sources:views:11464

the station was successfully completed and put into operation in june 2019, which provides large-capacity power supply guarantee for many important loads. zhengchao electric provides the station with 10kv armored shift-type switchgear, a total of 53 sets. since the operation of the product, the performance is safe, stable, large capacity and low temperature rise, which is well received by users.

"));
网站地图